🔒

Configurator

Enter the access code to continue.

Eco2 Solar Project Configurator

Eco 2u NW Ltd · Midsummer trade prices, ex-VAT · catalogue prices dated 15 August 2026

Configure Project

Set the kit, quantities and rates here

Project

Panels, mounting and storage.
Comparison presets

Margin

Used by any brand without its own rate below.
The brand sets the margin for the whole quote Not just the storage line — panels, mounting, labour and certification all move with it, on this page and on Ryan’s.
Always applied to storage, array, mounting, electrical and extras — except scaffolding, which is at cost. The two fees below are optional — untick one to pass it through at cost.
Ryan’s commission is never marked up — it is a deduction from what we keep, not a cost to sell on.
Prices are exact to the penny — nothing is rounded. Rounding moved money nobody had decided on: a panel at £99.31 quoted at £100 is £8.28 added across twelve of them.

Array

Mounting systems in the catalogue

Essentials — on every job

Kurt, 22 Aug 2026: these go on every project without asking. Bird protection sits here with the AC isolator, not in the project-dependent list.

Depends on the project

Decided at survey, by the house and the roof — not by the customer. Leave at zero when it does not apply.
Measured at survey Nothing in the catalogue says how much cable a job needs — it depends on the run from roof to inverter. It starts at zero: put the measured length in.

Scaffolding

One side is included on every job — we carry it out of margin and the customer pays nothing for it. Sides beyond the first are charged at cost, with no margin. Put 0 if the job needs no scaffolding.

Optional extras — the customer chooses

Not driven by the house. These are upsells the customer either wants or does not. Every priced line comes from Midsummer, not the OpenSolar sheet.

EV charger upsell

Priced on its own rules, not the solar rate card. No brand margin, a flat fitting charge, and it is the one part of the quote the customer pays VAT on.
Tethered or untethered? Tethered means the charging cable is permanently attached to the unit — unhook it, plug in, done. Fastest day to day, but the cable length and the connector are fixed for the life of the unit. Untethered (also sold as “socketed”) is a socket on the wall and the driver plugs in their own cable — tidier when it is not in use and it suits any car and any cable length, but the cable lives in the boot. Untethered is the cheaper unit; tethered is the easier sell.

Travel & accommodation

A flat £300, not marked up One figure covering hotel and diesel on a long job. It is cost recovery, so it is added to the price at cost and left out of the margin and the rounding — the customer pays exactly the £300.

Labour & certification

Ryan’s commission

Charged on the project total, ex-VAT — the customer price after margin and rounding, before VAT is added. Varies by project.
This is a direct cost, not a share of profit Ryan’s fee comes off in full before profit is worked out, and it is the one thing the markup is not applied to. The customer pays the same either way; the whole of it comes out of what we keep.

Sold above the rate card

How the uplift works The rate-card price above is the base. If the closer sells for more than that, the extra is split — 20% to them, 80% to us — on top of their commission on the base. Nothing about the job changes, so the whole uplift is profit apart from their share of it. This is the same model Ryan sees on his own page.

Cost per acquisition

What it costs in advertising to win one job. A working average — change it here as the real number moves.
Anything given away to close the job. Comes off what we keep, the same as the advertising — the quoted price above does not move.
Comes off the profit, and is funded up front It is a cost of winning the sale, so it is deducted like Ryan’s commission rather than treated as overhead — and it appears in the cash-flow panel too, because it is paid long before the customer does.

Finance

0% APR to the customer, a subsidy to us The customer pays the quoted price and nothing more. The lender advances that figure less the subsidy, so the whole of it comes off what we keep — the same way Ryan’s commission does.

Total Project Cost

What the choices on the left add up to

Overview

Array
Storage
Project total
£ per kW
Products at cost
Margin added
Profit left over
Net margin
Project total

OpenSolar — what the closer types in

One figure, entered once Nobody itemises isolators, cable, mounting, labour or scaffolding on a customer proposal, and hand-entering a dozen small lines is where mistakes get made. OpenSolar takes a single manual cost line, so that is all the closer enters and the proposal is built around it. The breakdown above is for us, not for the proposal — the total is the same either way.